construction of 500 kV OHTLs – Hawamdeya substation, turnkey basis (Lot-2)
client name
Egyptian Electricity Transmission Company (EETC)
industry
Power
location
Egypt
pulse by solutions was awarded the construction of 500 kV Overhead Transmission Lines (OHTLs) on turnkey basis.
Project scope
Solutions
In partnership with High Dam Electrical & Industrial Projects Co. (HIDELICO), scope was for the construction of 500 kV Overhead Transmission Lines (OHTLs) on turnkey basis to connect the Hawamdeya Substation to the national electrical grid.
Solutions
Flood warning
Environmental warning
Traffic monitoring
Smart waste
Smart water
Smart lighting
Smart energy
Smart irrigation
Crowd monitoring
Smart parking
Digital experience
Digital wayfinding
Showcasing heritage assets
Pedestrian access control & intrusion detection
Vehicular access control & intrusion protection
Solutions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Impact & results
Increasing power
Reducing load off existing 220 kV lines
Fortifying international electrical interconnections with neighboring countries
Impact & results
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030