pulse by solutions was awarded South El Kayan substation expansion project for EETC.
Project scope
Services
pulse by solutions is to implement a 220 kV gas-insulated (GIS) cable cell on a turnkey basis to provide a primary power source for the TSS01 electric traction station.
Solutions
Flood warning
Environmental warning
Traffic monitoring
Smart waste
Smart water
Smart lighting
Smart energy
Smart irrigation
Crowd monitoring
Smart parking
Digital experience
Digital wayfinding
Showcasing heritage assets
Pedestrian access control & intrusion detection
Vehicular access control & intrusion protection
Solutions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Impact & results
Enhanced efficiency of the national power grid
Improved reliability of power supply
Cost and energy savings
Contributing to Egypt’s move toward sustainable infrastructure development
Impact & results
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030