pulse by solutions was chosen in partnership with Shandong Taiki for the expansion project of El Kom El Ahmar 220/66/11 KV substation.
Project scope
Solutions
pulse by solutions and Shandong Taikai Consortium scope for the project includes the supply and installation of an indoor air-insulated substation (AIS) for El Badari town in Assiout governorate, to replace the old conventional transmission systems.
Solutions
Flood warning
Environmental warning
Traffic monitoring
Smart waste
Smart water
Smart lighting
Smart energy
Smart irrigation
Crowd monitoring
Smart parking
Digital experience
Digital wayfinding
Showcasing heritage assets
Pedestrian access control & intrusion detection
Vehicular access control & intrusion protection
Solutions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Impact & results
Better control and monitoring of operations
Better service reliability
User-friendly interface
Safe enclosure of all live parts, safeguarding them against high temperatures, any vandalism or damage
Reduced maintenance costs
Impact & results
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030