pulse by solutions was contracted to design, supply, install, test and commission 415 Vac switchboard panels and associated relay panels serving Turkwel hydro power station.
Project scope
Services
The scope encompassed the rehabilitation of the Turkwel hydro power station. The project entailed the following:
Careful analysis of the existing schemes to ensure integration of the new components and systems with existing controls
Monitoring and supervision schemes
Re-design of the controls and interface to the automation PLC and SCADA
Process instrumentation of the switchboards
Ensuring integration of the solution with existing infrastructure, stabilization, testing, and training
Solutions
Flood warning
Environmental warning
Traffic monitoring
Smart waste
Smart water
Smart lighting
Smart energy
Smart irrigation
Crowd monitoring
Smart parking
Digital experience
Digital wayfinding
Showcasing heritage assets
Pedestrian access control & intrusion detection
Vehicular access control & intrusion protection
Solutions
Careful analysis of the existing schemes to ensure integration of the new components and systems with existing controls
Monitoring and supervision schemes
Re-design of the controls and interface to the automation PLC and SCADA
Process instrumentation of the switchboards
Ensuring integration of the solution with existing infrastructure, stabilization, testing, and training
Impact & results
Optimize operational efficiencies
Eliminate issues arising from the use of old switchboards
Ensure proper and continuous operations for the hydro power plant
Impact & results
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030
Optimized infrastructure & operational efficiency
Optimized resource management
Seamless user experience for Diriyah’s residents and visitors
Contributing towards achieving the Kingdom’s Vision 2030