Success stories

leading with results. turning vision into value.

Project at a glance

North Edge Towers in New Alamein city project

client name

Ministry of Housing, Utilities & Urban Development - Al Alamein New City Municipality

End-user

King Abdullah university of science and technology (KAUST)

industry

smart cities

location

Al Alamein, Egypt

north edge towers in New Alamein city

pulse by solutions was selected by SIAC to implement fully integrated security and safety solutions in the North Edge Alamein Towers.

Project scope

services

pulse by solutions was awarded the project to provide a number of solutions including:

  • Access Control System
  • Fire Alarm System
  • Video Surveillance System (CCTV)
  • Cybersecurity
  • Building Management System
  • Asset Management
  • LAN Switching System
  • Public Address System
  • Intercom System
  • Structured Cabling System
  • Disabled Alarm System

Solutions

Access Control System

Building Management System

Asset Management System

Fire Alarm System

Water Leakage System

Cybersecurity

video surveillance system (CCTV)

LAN switching system

Structured Cabling System

Public Address System

Disabled Alarm System

Intercom System

Security Access System

Master Clock System

Parking System

Queuing System

IPTV system

Audio Visual System

KNX system

Solutions

Data Infrastructure Passive (fiber + data cabling)

Data Infrastructure Active (PABX + LAN)

Access Control System

IP Voice Telephony System

Wireless Access Points

Cybersecurity

CCTV + VMS

Access Control System

Intrusion Detection System

Public Address System

Impact & results

  • Streamlining internal systems
  • Improving reliability and uptime
  • Increasing energy efficiency
  • Optimizing maintenance and cost savings
  • Creating a safer living environment at the North Edge Towers

Impact & results

  • Saving the existing investments in the applications
  • Saving the existing investments in staff training and preserving staff expertise
  • Minimizing down time during the replacement period compared to any alternative solution
  • Making use of the latest technology in the hardware arena, through the following:
    • Increasing availability due to redundant components and more reliable parts
    • Increasing storage capacity
    • Enhancing performance
    • Enriching features
    • Increasing expandability
  • Avoiding any additional replacements or modifications of any other systems rather than SMP and LAB, rendering it the most economical and practical replacement of LAB and SMP