Success stories

leading with results. turning vision into value.

Project at a glance

BMS and electromechanical works for Centro Hotel

client name

Centro Hotel

partner

juwi

industry

smart cities

location

Riyadh, KSA

pulse by solutions was awarded the project to provide MEP works for a major hotel in KSA, as well as install the latest cutting-edge Building Management Systems (BMS) in the hotel and its 154 rooms.

Project scope

services

  • HVAC works (chillers, ducts, piping, inlets and outlets, etc.)
  • Building Management System (BMS)
  • Plumbing works
  • Swimming pool equipment
  • Firefighting works (sprinklers and FM-200 system)
  • Electrical works
  • Light Current Systems
  • Ethernet data network (Active, Passive and NMS)
  • Voice system (communication, messaging, and recording)
  • Audio visual systems
  • Public address    
  • MATV systems

Solutions

Access Control System

Building Management System

Asset Management System

Fire Alarm System

Water Leakage System

Cybersecurity

video surveillance system (CCTV)

LAN switching system

Structured Cabling System

Public Address System

Disabled Alarm System

Intercom System

Security Access System

Master Clock System

Parking System

Queuing System

IPTV system

Audio Visual System

KNX system

Solutions

Data Infrastructure Passive (fiber + data cabling)

Data Infrastructure Active (PABX + LAN)

Access Control System

IP Voice Telephony System

Wireless Access Points

Cybersecurity

CCTV + VMS

Access Control System

Intrusion Detection System

Public Address System

Impact & results

  • Enhancement in reliability and comfort, enabling our client to increase the hotel rating from a 3-star to a 4-star hotel
  • The client saved time and money with pulse by solutions Electro-mechanical’s capacity to fulfill contractual obligations for both MEP and civil works

Impact & results

  • Saving the existing investments in the applications
  • Saving the existing investments in staff training and preserving staff expertise
  • Minimizing down time during the replacement period compared to any alternative solution
  • Making use of the latest technology in the hardware arena, through the following:
    • Increasing availability due to redundant components and more reliable parts
    • Increasing storage capacity
    • Enhancing performance
    • Enriching features
    • Increasing expandability
  • Avoiding any additional replacements or modifications of any other systems rather than SMP and LAB, rendering it the most economical and practical replacement of LAB and SMP