Success stories

leading with results. turning vision into value.

Project at a glance

installation and services for the Sukari Gold Mine Solar Power Plant

client name

Centamin plc

partner

juwi

industry

manufacturing

location

Eastern Desert, Egypt

Centamin plc has awarded juwi and pulse by solutions the engineering, procurement and construction (EPC) contracts for its 36 MW solar farm and 7.5 MW battery-energy storage system at the Sukari gold mine – the world’s largest hybrid project at an off-grid mine.

Project scope

services

In partnership with juwi, pulse by solutions was awarded the engineering, procurement and construction (EPC) contracts for the Sukari gold mine 36 MW solar farm and 7.5 MW battery-energy storage system. pulse by solutions scope of work covers the installation of the 36 MW Sukari solar plant.

Solutions

Access Control System

Building Management System

Asset Management System

Fire Alarm System

Water Leakage System

Cybersecurity

video surveillance system (CCTV)

LAN switching system

Structured Cabling System

Public Address System

Disabled Alarm System

Intercom System

Security Access System

Master Clock System

Parking System

Queuing System

IPTV system

Audio Visual System

KNX system

Solutions

Data Infrastructure Passive (fiber + data cabling)

Data Infrastructure Active (PABX + LAN)

Access Control System

IP Voice Telephony System

Wireless Access Points

Cybersecurity

CCTV + VMS

Access Control System

Intrusion Detection System

Public Address System

Impact & results

  • Reduced diesel oil consumption by more than 22M litres per year
  • Reduced Carbon emissions by more than 60,000 tonnes CO2-e per year
  • Increased reliability of the power system
  • Reduced operating costs

Impact & results

  • Saving the existing investments in the applications
  • Saving the existing investments in staff training and preserving staff expertise
  • Minimizing down time during the replacement period compared to any alternative solution
  • Making use of the latest technology in the hardware arena, through the following:
    • Increasing availability due to redundant components and more reliable parts
    • Increasing storage capacity
    • Enhancing performance
    • Enriching features
    • Increasing expandability
  • Avoiding any additional replacements or modifications of any other systems rather than SMP and LAB, rendering it the most economical and practical replacement of LAB and SMP