pulse by solutions was awarded the design, engineering, supply and commissioning of 7 Electro-Hydraulic Wellhead Control Panels (WHCP) to be used for operating wells at the Meleiha gas plant.
Project scope
services
Complete system design, engineering, documentation, assembly of valves, spools, and fittings used for the installation of a hydraulic system to regulate the pressure inside the gas pipeline.
The Electro-Hydraulic Control Panel is composed of:
Safety PLC SIL2 certified (1 MTU & 7 RTUs)
Telecommunication equipment (GSM & Wi MAX)
Power system (solar system with PV panels and batteries)
Hydraulic panel (complete with control valves & its accessories)
The implementation of the project included:
Control logic and schemes applied to the hydraulic systems to ensure timely response to alarms and smooth user operations and interface
Installation of a solar energy system to provide the necessary power for wellhead operations in the remote location
Connecting 7 wellheads to the central control room through wireless communication, relying primarily on WiMAX technology, and secondarily on GSM as a backup
Factory Acceptance Test in pulse by solutions Free Zone
Site Acceptance Test in Meleiha gas plant
Offsite training at pulse by solutions head office
Solutions
Access Control System
Building Management System
Asset Management System
Fire Alarm System
Water Leakage System
Cybersecurity
video surveillance system (CCTV)
LAN switching system
Structured Cabling System
Public Address System
Disabled Alarm System
Intercom System
Security Access System
Master Clock System
Parking System
Queuing System
IPTV system
Audio Visual System
KNX system
Solutions
Data Infrastructure Passive (fiber + data cabling)
Data Infrastructure Active (PABX + LAN)
Access Control System
IP Voice Telephony System
Wireless Access Points
Cybersecurity
CCTV + VMS
Access Control System
Intrusion Detection System
Public Address System
Impact & results
Minimize and eliminate various maintenance problems
Contribute to solving a number of pipe network issues
Ensure smooth, proper and continuous operations at the station
Reduce operating costs
Enhance reliability
Support the efficiency of Kenya Pipeline Company’s network
Further contribute to the transformation of the Kenyan oil and gas infrastructure
Impact & results
State-of-the-art WHCP solution that will:
Optimize performance and process stability
Enhance gas production
Provide higher quality and safety levels
Ensure minimal operational interruption
Provide maintenance of wellhead operations and shutdown readiness all throughout the year
Provide steady and continuous communication
Facilitate future usage of solution at different wellheads
Facilitate integration with existing systems and its scalability to accommodate future additions